loader image

Energy Facilities

District heating system of Obrenovac

In the period from 2017 to 2018, Millennnium Team was a main contractor on the reconstruction and rehabilitation of district heating pipeline in the city area of Obrenovac. The following pipelines were built within the project:

• Pre-insulated steel pipeline approximately 5 km
· Pre-insulated flexible pipeline approximately 1.2 km

Location

Obrenovac

Employer

PUC “TOPLOVOD” Obrenovac

Type of Service

Reconstruction and rehabilitation of district heating pipeline

Period/Status

2017-2018; Finished.

„Turkish stream“ Section 1 – Finished earth works

Energy Facilities

Distribution gas pipeline Belgrade – Valjevo- Loznica

Energy Facilities

TurkStream

Energy Facilities

Gasification of populated areas on the territory of Kraljevo

Energy Facilities