Construction of distribution gas pipeline RG – 05-06 Belgrade– Valjevo - Loznica

This contract stipulates that Millennium Team, in the capacity of the main contractor, shall , carry out geological surveying and geodetic works, prepare project documentation for a building permit, and executes works on construction of distribution gas pipeline Belgrade-Valjevo-Loznica, in the length of 160km with 8 MMRS.
Designing and execution is divided into two phases, the first phase is on the route Belgrade – Valjevo and the second phase is Valjevo – Loznica.

Location

Belgrade – Obrenovac – Ub – Lajkovac – Valjevo – Loznica

Employer

PE Srbijagas Novi Sad

Type of Service

Designing and construction of distribution gas pipeline and accompanying MMRS

Period/Status

2021 – in progress;
Work on the first phase of construction is in progress (Belgrade-Valjevo section, more than 50 km have been built so far).

„Turkish stream“ Section 1 – Finished earth works

Energy Facilities

TurkStream

Energy Facilities

Gasification of populated areas on the territory of Kraljevo

Energy Facilities

Civil works within the thermal power plant „Kostolac“

Energy Facilities