loader image

Projects

„Turkish stream“ Section 1 – Finished earth works

Energy Facilities

Distribution gas pipeline Belgrade – Valjevo- Loznica

Energy Facilities

TurkStream

Energy Facilities

Gasification of populated areas on the territory of Kraljevo

Energy Facilities

EXPO Belgrade 2027

1,239,582.2 m2

National Football Stadium

875.064 m2

Preljina-Požega

88.080m2

Ležimir

194.300 m2