Embankment within “Belgrade Waterfront” project

Construction of the embankment within “Belgrade Waterfront” project

The project was executed in three phases, in total length of 1.500m:
The works included rehabilitation and reconstruction as well as increasing the height of the embankment, partial demolition with the construction of the embankment body structure with retaining walls for the purpose of raising the current embankment level, complete installations, landscaping with an irrigation system, construction of a bicycle path and traffic signals, paving as well as the installation of furniture and lighting.

Location

Belgrade

Employer

Beograd na vodi d.o.o.

Type of Service

Reconstruction and construction of the embankment

Period/Status

2017-2022; Finished embankment from Brankov Bridge to Gazela Bridge, in the total length of 1.500m;
The construction of Vidikovac – the bridge in front of the Tower – is in progress.

EXPO 2027

Engineering Facilities

National Football Stadium with accompanying facilities

Engineering Facilities

New Sava Bridge

Engineering Facilities

Institute for Early Child Development and Inclusion

Engineering Facilities