The contract envisages the design and construction of gas facilities in the area of Belgrade Waterfront, namely:

The distribution gas pipeline network made of steel pipes MOP=16 bar from the existing distribution gas pipeline GM05-04 in Maleška street (section for CCS) to the border of SPSPA “Belgrade Waterfront;

High-pressure 50 bar gas pipeline, 8 km long, with the relocation of the existing main metering and regulating station „Bežanija “and the construction of a new main metering and regulating station „Bežanija 2“with a capacity of 160,000 m3/h;

A medium-pressure gas pipeline of 16 bar, 12 km long, as well as the construction of a connecting pipeline next to the metering and regulating station „Belgrade Fair “.Millennium Team is the main contractor on this project.

Location

Belgrade

Employer

PE Srbijagas Novi Sad

Type of Service

Designing and construction of gas pipeline, as well as construction of MRS

Period/Status

2018 – in progress.

„Turkish stream“ Section 1 – Finished earth works

Energy Facilities

Distribution gas pipeline Belgrade – Valjevo- Loznica

Energy Facilities

TurkStream

Energy Facilities

Gasification of populated areas on the territory of Kraljevo

Energy Facilities