This project, which was carried out in the period from 2012 to 2014, included the reconstruction of the sewage network in Kisačka and Rumenačka streets, in the urban part of Novi Sad. Sewage network: ductile 3400m and PVC 1852m; Water network of PE pipes 593m; Reinforced concrete shafts 61 pieces; Asphalting works 10,800m2.
CONTACT
- Žanke Stokić 39, 11000 Belgrade, Serbia
- office@millenniumteam.rs
- Tel: +381 11 313 95 25
- Fax: +381 11 313 95 97
Millennium Team 2024 | All Rights Reserved