loader image

Energy Facilities

Construction of transmission Gas Pipeline (Interconnector) 'Border of Bulgaria — Border of Hungary', Section

Section 1 of the main gas pipeline route from km 0+000 to km 75+000 was the most demanding on the entire route, it was built through very difficult terrain of eastern Serbia mountain massifs and is crossed by a multitude of torrential watercourses. Within Section 1, there were more complex sections, steep slopes, which are eroding due to unfavorable meteorological phenomena and which require stabilization and restoration to their original state.

Location

The territory from the border with Bulgaria to the border with Hungary – Section 1 (km 0+000 do km 75+000) near settlements Vrška Čuka, Grljan, Zaječar, Lenovac, Bačevica, Dobrujevac, Boljevac, Lukovo, Krivi Vir up to Grza.

Employer

PE Srbijagas Novi Sad

Type of Service

Engineering protection against erosion and regulation of torrential flows

Period/Status

2021-2023; In progress.

Distribution gas pipeline Belgrade – Valjevo- Loznica

Energy Facilities

TurkStream

Energy Facilities

Gasification of populated areas on the territory of Kraljevo

Energy Facilities

Civil works within the thermal power plant „Kostolac“

Energy Facilities