Millennium Team has, since 2018, concluded three Contracts with the Chinese company CMEC:
– Construction of a cooling water system, i.e. construction of a siphon well, construction of a culvert for the discharge of cooling water, as well as construction of steel pipe for cold water
– part of the external system for heavy fuels, i.e. the construction of the heavy oil tank foundation with a closed wall, as well as the foundation for the new structure that needs to be connected to the existing
– FDG (Flue Gas Desulphurization) facilities – two connected multi-story facilities separated by dilation and constructively and architecturally function as two separate units.
CONTACT
- Žanke Stokić 39, 11000 Belgrade, Serbia
- office@millenniumteam.rs
- Tel: +381 11 313 95 25
- Fax: +381 11 313 95 97
Millennium Team 2025 | All Rights Reserved