Energy Facilities

Execution of civil works wihin the thermal power plant „Kostolac “

Millennium Team has, since 2018, concluded three Contracts with the Chinese company CMEC:
– Construction of a cooling water system, i.e. construction of a siphon well, construction of a culvert for the discharge of cooling water, as well as construction of steel pipe for cold water
– part of the external system for heavy fuels, i.e. the construction of the heavy oil tank foundation with a closed wall, as well as the foundation for the new structure that needs to be connected to the existing
– FDG (Flue Gas Desulphurization) facilities – two connected multi-story facilities separated by dilation and constructively and architecturally function as two separate units.

Location

Kostolac

Employer

China Machinery Engineering Corporation (CMEC)

Type of Service

Execution of civil works

Period/Status

2019-2023; Finished.

„Turkish stream“ Section 1 – Finished earth works

Energy Facilities

Distribution gas pipeline Belgrade – Valjevo- Loznica

Energy Facilities

TurkStream

Energy Facilities

Gasification of populated areas on the territory of Kraljevo

Energy Facilities