Millennium Team is the main contractor for the design and construction of medium-pressure gas supply pipelines, mass consumption measuring stations and distribution gas pipeline networks with household gas connections in populated areas of the municipality Grocka.
The construction of 54,23 km of medium-pressure gas pipeline MOP 16 bar, 24 km of distribution gas pipeline network MOP 4 bar, in the length of 590km, construction of 455km of MRS, mass consumption 14 pcs and MMRS capacity of Q=60.000m3/h was contracted.