The project was executed in three phases, in total length of 1.500m:
The works included rehabilitation and reconstruction as well as increasing the height of the embankment, partial demolition with the construction of the embankment body structure with retaining walls for the purpose of raising the current embankment level, complete installations, landscaping with an irrigation system, construction of a bicycle path and traffic signals, paving as well as the installation of furniture and lighting.