Gasification of the municipality of Rakovica

Millennium Team is engaged as the main contractor for the gasification of the city municipality of Rakovica. The construction of 180 km of polyethylene pipelines, 70 km of steel pipelines, 5 metering and regulating stations and 3 main metering and regulating stations was contracted.
Gasification of city municipality Zemun

This project includes the construction of a 25 km of steel medium-pressure gas pipeline, as well as the construction of a distribution gas pipeline using polyethylene pipes with a total length of 470 km and the construction of 10 metering and regulating stations.
Gasification of the city municipality of Grocka

Millennium Team is the main contractor for the design and construction of medium-pressure gas supply pipelines, mass consumption measuring stations and distribution gas pipeline networks with household gas connections in populated areas of the municipality Grocka. The construction of 54,23 km of medium-pressure gas pipeline MOP 16 bar, 24 km of distribution gas pipeline network […]
Gasification of the city of Smederevo

Millennium Team is the main contractor for the design and construction of medium-pressure gas supply pipelines, mass consumption measuring stations and distribution gas pipeline networks with household gas connections in populated areas of the city of Smederevo. The construction of 55.8 km of medium-pressure gas pipeline MOP 16 bar, 733.3 km of distribution gas pipeline […]
Energy corridor Novi Sad

Millennium Team has within JV„PORR-MILLENNIUM TEAM“ executed works on the gas and oil pipelines relocation to the new energy corridor north of the E-75 highway, during which: 24.9 km of oil pipelines, 13.3 km of gas pipelines and 1 km of protective steel pipes have been constructed by under-drilling method under the roads.
Landscaping of BW Kula withing the „Belgrade Waterfront“ project

Millennium Team is executing works on landscaping and paving the area around the BW Kula, as part of the “Belgrade Waterfront” project.