loader image

Humanitarian Demining

ERW clearance project for „Ložionica“ complex

Area

22.600 m2

The demining sector of Millennium Team cleared the “Ložionica” site located in Belgrade, under the Gazela bridge near the Belgrade Waterfront settlement. The project involved surveying and clearing the terrain of explosive remnants of war at the depths of 0.50 to 6 m. In this location there are facilities under the protection of the Cultural Heritage Protection Institute of the City of Belgrade. One of the biggest challenges was the huge amount of waste that was at a depth of more than 3 m. In the same area, due to the execution of exploratory geological boreholes, surveying was done to a depth of 20m.

Humanitarian Demining Projects

EXPO Belgrade 2027

EXPO Belgrade 2027

1,239,582.2 m2
Nacionalni fudbalski stadion

National Football Stadium

875.064 m2
Preljina-Požega

Preljina-Požega

88.080m2
Ležimir

Ležimir

194.300 m2