Construction of the National Football Stadium with accompanying facilities

National football stadium with accompanying facilities with a capacity of 52,000 seats and access by stairs and ramps to the podium, from which there is direct access to the lower level of the stands. The boundary in design is 1m from the access ramps, the plateau between the facade and the ramps and stairs. The […]

EXPO Belgrade 2027

EXPO Belgrade 2027

The project of clearing explosive remnants of war (EOR) at the location where the International Specialized Exhibition „EXPO BELGRADE 2027“, will be held, on the territory of the municipality of Surčin, was carried out in accordance with the International Mine Action Standards and the current legislation of the Republic of Serbia. The area cleared of […]

„Turkish stream“ Section 1 – Finished earth works

Section 1 of the main gas pipeline route from km 0+000 to km 75+000 was the most demanding on the entire route, it was built through very difficult terrain of eastern Serbia mountain massifs and is crossed by a multitude of torrential watercourses. Within Section 1, there were more complex sections, steep slopes, which are […]

Distribution gas pipeline Belgrade – Valjevo- Loznica

This contract stipulates that Millennium Team, in the capacity of the main contractor, shall , carry out geological surveying and geodetic works, prepare project documentation for a building permit, and executes works on construction of distribution gas pipeline Belgrade-Valjevo-Loznica, in the length of 160km with 8 MMRS. Designing and execution is divided into two phases, […]

TurkStream

Millennium Team participated in the construction project of Turkish stream in the excavation and earthworks phase. The works included complete earthworks (1,175,000 m3 of excavation and backfilling) of 112 km along with all auxiliary access roads, with river crossings, piping, providing excavations with Larsen sheet piles, drilling wells for pumping water. Additionally, the company performed […]